Swenson Field Athletic Complex Redevelopment
Gale led the planning, design, and construction to redevelop the Swenson Field Complex. Renovations and updates include an infilled synthetic multipurpose game field, a 400-meter urethane track with duplicate field events throughout, a new 1,500-seat grandstand, modular press box, and filming platform, and a pre-engineered storage and amenities building. The stadium infrastructure includes state-of-the-art athletic lighting, scoreboards, message boards, and sound systems.

2011 ASBA Distinguished Track and Field Award