Structural Evaluation and Reinforcement Design for Roof, Mechanical Units, Photovoltaic Panel Replacement
Gale provided structural engineering consulting services to evaluate the existing roof framing for the replacement of 31 pieces of rooftop equipment at the Boston Water & Sewer Commission’s 980 Harrison Avenue building. Gale’s analysis of the existing roof structure identified isolated structural framing members that required structural augmentation prior to the replacement of the rooftop equipment. We also provided design phase services for the structural augmentation. The project will include the removal and replacement of the existing roof system and photovoltaic (PV) array.